Joint filling equipment
Keywords:
Joint filling equipment
Categores:
Joint filling equipment
Product Enquiries:
+86-17705341945Product description
Drive mode: Crawler machine (load capacity 500KG)
Speed: 0-11 kilometers per hour
Chassis height: 30cm
Ii. Heating Method: The burner heats the heat transfer oil, and the heat transfer oil heats the asphalt. The fire tube and heat transfer oil are used in combination for heating. The model of the matching burner is G10LC.10, a 100,000-calorie burner from Leya Road.
Iii. Reactor Parameters
A. The volume is 100 liters (can be customized according to customer requirements, or 200 liters).
B. Stirrer, frequency conversion, with stirring function.
C. Asphalt receiving method:
A three-way valve is installed on the sprinkler truck, along with a metal hose, which flows by gravity to the heating kettle.
(2) Block asphalt is directly poured into the wide-mouth.
Product Message